City of Dickinson City Hall

Project Description

Dickinson City Hall / WCID modifications- demolition of council room, Mayors’ office, and WICD office to support social distancing. Period of Performance was 21 calendar days. We constructed a Dias (council chambers desk) that allows for 6ft distancing between 9 members of council including mayor. Constructed AV / storage room in chambers. Hung 98in flat screens TVs in council chambers, re-carpeted and painted council room. Opened up Mayors’ office to a large conference room for social distancing. Re-carpeted Jury room.

WCID modifications- demoed all mill-work, VCT, carpet. Re-carpeted, new VCT, new paint and added a social distancing Pharmacy type transaction window for citizens to drop off water bills. Original plans became obsolete during construction as it was agreed upon by all including end users to remove the fur downs and redo the ceiling grid instead.

City of Wylie – Fire Station

Project Description

Due to the pandemic, many organizations have had to take a closer look at their current Safety Procedures and make changes to accommodate the current COVID-19 guidelines.

A fire department in North Texas was in need of an additional 2-story storage room build out to store COVID-19 personal protection equipment and emergency materials while kept at a constant 70 degrees Fahrenheit.

The sealed storage room was built inside of a larger metal storage building with its own HVAC system. A stairway on the outside of the storage unit was built leading to the second story loft of the storage building. An additional concrete walking path was added to the location around the exterior of the building.

Modifications were made to the building for the installation of a thru-wall package drop vault near the entrance. The storage room is equipped with added smoke detectors and reinforced 18 gauge metal doors.

This project was designed and built within one month.

Joslin Power Plant

Project Description

ERC conducted a Pre-Demolition Regulated Building Materials Survey of the Old Joslin Power Plant located at 2313 FM 1593 in Point Comfort, Texas 77978. The objective of the survey was to ascertain the general presence, quantity, and location of Asbestos Containing Materials (ACMs), Lead-Based Paint (LBP), Polychlorinated Biphenyls (PCBs), Arsenic in surface soils, Chlorofluorocarbons (CFCs), Bird Droppings, and universal waste at the site. The results of the survey will assist in the preparation of an abatement scope of work and subsequent abatement of identified ACMs, LBPs, PCBs, CFCs, Bird Droppings, and other potential materials, and universal waste that may be required prior to demolition activities.

The Site includes a three-story brick building slab on grade foundation with a ten-story boiler vent and surrounding property that includes canopies, structures, various tanks, boilers, and condensers. From 1972 to 2012, the Site has been utilized as an industrial natural gas-powered electrical power plant.

Sam Houston Historic Park

Project Description

The City of Houston General Services Department, on behalf of the Houston Parks and Recreation Department, contracted with ERC to perform repairs of the historic buildings in Sam Houston Park. A total of eight (8) buildings were identified and the scope of work was prepared based on their unique needs. Although all eight buildings are of the same construction type, wood frame with wood siding, each has its own special set of requirements that needed to be addressed on an individual basis.

Welding Booths at HCC

Project Description

Lincoln Electrical hired ERC to install welding booths at the new Houston Community College campus in North Forest. Coordination with the general contractor for hooking the booths up to various electrical and other systems.

Included:

  • Project Management
  • Coordinating with the general contractor
  • Unload, inspect, and install 16 welding booths and associated tables

Tomball ISD Flooring

Project Description

Removed and replaced flooring throughout the Middle and High Schools. Three flooring types were completed: carpeting, rubber, and stained concrete.

Included:

  • Project Management
  • Remove and dispose of existing flooring
  • Prep and install new flooring
  • Apply client-provided logo in cafeteria on stained concrete

McGovern-Stella Link Library

Project Description

Interior renovation after flooding during Hurricane Harvey. This was the first FEMA-specific project put through the City of Houston General Services Division.

Included:

  • Project Management
  • Interior sanitizing and cleaning
  • Replace flooring
  • Replace walls and dividers
  • Painting throughout
  • Refinishing select woodwork

Spring ISD Stadium Ramp Install

Project Description

Install ADA-compliant ramps and wheelchair seating on both the Guest and Home side of Leonard George Stadium located in Houston, Texas.

Included:

  • Project Management
  • Installation of ramps, metal frame, wire mesh, hand rails, and aluminum flooring
  • Concrete pour
  • Remove existing seating to accommodate wheelchair area
  • Install handrail and wire mesh at backside of new area to prevent accidents

>

1111 Fannin AHU Refurbish

Project Description

Provided an asbestos survey and refurbished three air handling units (AHUs) at 1111 Fannin in Houston, Texas.

Included:

  • Wash the chill water coils
  • Clean and sanitize complete unit
  • Repair filter rack
  • Scrape and clean area below chill water coil
  • Prepare condensate pan for coating
  • Install metal blank offs on each side of the coil to eliminate any air bypass
  • Replace insulation on the leaving side of the coil
  • Apply anti-microbial epoxy pan coasting to condensate drain pain, coil framework, and underneath fan section
  • Apply stain blocker to all insulation and meatals
  • Replace AHU fan motor

Provide air flow readings before and after.

Spring ISD Learning Center Signage

Project Description

Installed signage on exterior of Spring ISD’s The Learning Center located in Houston, Texas. Built new brick monument sign at street.

Included:

  • Project Management
  • Drawings
  • Permitting
  • Removed exterior building signage
  • Built new brick monument sign
  • Electrical (lighting for monument sign)
  • Installed lettering on exterior of building and monument sign