City of Dickinson City Hall

Project Description Dickinson City Hall / WCID modifications- demolition of council room, Mayors’ office, and WICD office to support social distancing. Period of Performance was 21 calendar days. We constructed a Dias (council chambers desk) that allows for 6ft distancing between 9 members of council including mayor. Constructed AV / storage room in chambers. Hung …

City of Wylie – Fire Station

Project Description Due to the pandemic, many organizations have had to take a closer look at their current Safety Procedures and make changes to accommodate the current COVID-19 guidelines. A fire department in North Texas was in need of an additional 2-story storage room build out to store COVID-19 personal protection equipment and emergency materials …

Sam Houston Historic Park

Project Description The City of Houston General Services Department, on behalf of the Houston Parks and Recreation Department, contracted with ERC to perform repairs of the historic buildings in Sam Houston Park. A total of eight (8) buildings were identified and the scope of work was prepared based on their unique needs. Although all eight …

Joslin Power Plant

Project Description ERC conducted a Pre-Demolition Regulated Building Materials Survey of the Old Joslin Power Plant located at 2313 FM 1593 in Point Comfort, Texas 77978. The objective of the survey was to ascertain the general presence, quantity, and location of Asbestos Containing Materials (ACMs), Lead-Based Paint (LBP), Polychlorinated Biphenyls (PCBs), Arsenic in surface soils, …

Welding Booths at HCC

Project Description Lincoln Electrical hired ERC to install welding booths at the new Houston Community College campus in North Forest. Coordination with the general contractor for hooking the booths up to various electrical and other systems. Included: Project Management Coordinating with the general contractor Unload, inspect, and install 16 welding booths and associated tables

McGovern-Stella Link Library

Project Description Interior renovation after flooding during Hurricane Harvey. This was the first FEMA-specific project put through the City of Houston General Services Division. Included: Project Management Interior sanitizing and cleaning Replace flooring Replace walls and dividers Painting throughout Refinishing select woodwork

Tomball ISD Flooring

Project Description Removed and replaced flooring throughout the Middle and High Schools. Three flooring types were completed: carpeting, rubber, and stained concrete. Included: Project Management Remove and dispose of existing flooring Prep and install new flooring Apply client-provided logo in cafeteria on stained concrete

Spring ISD Stadium Ramp Install

Project Description Install ADA-compliant ramps and wheelchair seating on both the Guest and Home side of Leonard George Stadium located in Houston, Texas. Included: Project Management Installation of ramps, metal frame, wire mesh, hand rails, and aluminum flooring Concrete pour Remove existing seating to accommodate wheelchair area Install handrail and wire mesh at backside of …

1111 Fannin AHU Refurbish

Project Description Provided an asbestos survey and refurbished three air handling units (AHUs) at 1111 Fannin in Houston, Texas. Included: Wash the chill water coils Clean and sanitize complete unit Repair filter rack Scrape and clean area below chill water coil Prepare condensate pan for coating Install metal blank offs on each side of the …

Spring ISD Learning Center Signage

Project Description Installed signage on exterior of Spring ISD’s The Learning Center located in Houston, Texas. Built new brick monument sign at street. Included: Project Management Drawings Permitting Removed exterior building signage Built new brick monument sign Electrical (lighting for monument sign) Installed lettering on exterior of building and monument sign